The Cahill Energy Waste to Energy project continues to feature in the news. The Facebook page Waste To Energy Plant has attracted 6157 members to date and is a source of valuable information for Bajans to educate themselves about plasma gasification technology and related matters. All should become members of the page to show solidarity with the cause.

If you do not stand for something you will fall for anything!

Cahill Energy
Cahill Energy

Discover more from Barbados Underground

Subscribe to get the latest posts sent to your email.

952 responses to “cahill energy Barbados WtE Project – Confidential Information Memorandum March 2015”


  1. A reminder to join the Facebook group those who have not to support the effort. The group is moving to 8000 members next.

    https://www.facebook.com/groups/Corruptionbarbados/requests/?notif_t=group_r2j


  2. the presentation is dated up to 2012
    however the data is important to show the rapid pace and acceptance of these plants by countries across Europe and also in the USA where more than 86 plants have been built since 2010
    Again another source of data that is significant in the importance of showing the necessary proof against a backdrop of negative crticism that protrays WTE plants as a conductor for producing unfounded theories and criticism which bears down on the relevancy to health related issues


  3. @ac July 19, 2015 at 7:47 PM # It seems that some of the literates assume that they have a right to impose their way of thinking on what barbadians can or should stomach especially going by the past weeks events it seems that barbadians can stomach just about any and everything including the mountains of garbage which has been purposefully left to decorate the streets,

    xxxxxx

    Actually, that Barbadians are ‘stomaching’ the garbage pile up etc, demonstrates just how fed up they are,…….

    Reminds me of an old saying ‘don’t take silence for agreement’.

    Word to the wise (or maybe, in this case, not so wise as they would like to think they are).


  4. And then again since 2010 86 WTE plants have been built in the USA mostly to combat waste management and produce energy against a backdrop of flawed theories and impositions and lectures and public speeches made by DR conett and environmentalist group who wants to impose their way of thinking while trying to slow , impede and retard technological progress to a crawl


  5. In light of a rejection of garbage incineration as a possibility for Ottawa, which reportedly you expressed at last Thursday’s environment committee and which may well be shared by other councillors and the Mayor, it may be helpful to have a point clarified in regards to the extension of the Plasco agreement deadline coming to a Council vote.

    But first, I would like to commend a stand against garbage incineration, and as a resident would like to express my support for the rejection of incineration as a preferred means for disposing of our un-recyclable solid waste.

    The key point I would like to convey is that, put plainly and contrary to what I found many persons in our city seem to believe, the “plasma gasification” process IS in fact a form of garbage incineration: the process is based on burning garbage, albeit with some technology applied in the process to try to squeeze out some of the energy that is normally wasted outright in, say, an open pit burning.

    Colloquially speaking, plasma is hot, electrically charged gas, and what this process would do is use a continuous electric charge (an “electric arc” -like a giant, constant spark plug) to burn garbage in a contained medium, so the resulting gases -some of which would be electrically charged because of the electric ignition- in turn would: a) heat something directly, and/or b) be ignited further to get some more energy out of that reaction. Put plainly, this would be achieved by containing momentarily the initial emissions of the burned garbage, and getting some of the gases to burn further and use the resulting heat.

    The really big problem with it is, as in any form of incineration, the inevitable discharge of very toxic pollutants into the air. Carbon monoxide is among the least problematic: a very wide range of highly toxic pollutants have been identified in the emissions from this process. A system of ‘dampers’ which blow water or steam along a smokestack to try to ‘precipitate’ as much residue as possible to the bottom of a stack cannot be expected to fully control toxic emissions -much would escape, not just as microparticles, but also as gases.

    The process in question is more sophisticated than burning in an open pit, but it does boil down to burning garbage -garbage incineration- with very toxic air pollutants resulting from it. And there would also be toxic solid waste resulting from this, though we have not heard much on how that would be handled safely, particularly if its handling is costly and not the focus of a for-profit venture centred on burning garbage for limited, hopeful energy production.

    See more at: http://unpublishedottawa.com/letter/344/plasco-and-problem-plasma-gasification#.dpuf


  6. Navigator is the big toronto PR company this woman is using to debunk the bad press she is getting from her attempt to scam us .her booming voice over dinner was enough to make u think she owned the joint. A word to the wise skinny lady with the big hair keep your voice down and your mystery deals wont be heard all over the restaurant.


  7. Multinationals wouldn’t come in and hurt the population what a joke may I remind this woman of union carbide and Bhopal.
    Is she for real .
    She quotes the health and safety executives of a number of countries saying this technology is approved by them all . there is no plant of this size anywhere in the world that is operational
    She is great at generalisation she has not published one document to substantiate the validity of her bull shite.
    Make no mistake she is selling this contract for her own benefit and will disappear on the next plane out of here.


  8. Minister Lowe !!!! who owns the 15 acres of land designated to this plasma plant???
    There is nothing on record to indicate the transfer is complete ??
    Will the title sit with this scam woman to use as she sees fit??? Maybe she has used the land as collateral to fund her efforts to continue her attempted scam

    She knows nothing about Health and Safety. She operates from a condo in the four seasons in Toronto
    Does she realise that all the countries she mentioned in her interview hold the CEO of the company directly responsible for the health and safety of the work they perform both directly and through contractors and consultants !!ยก!!!!!!
    If this unproven scaled up plant kills someone she is directly responsible
    HOWEVER she will be long gone by then
    She is selling this pig in a bag and moving on …………..


  9. check out the Toronto PR firm she’s using to try deflect away from the real issues with thing Navigator out of Toronto
    High stakes poker and you can see her “tell” twisting of the hair involuntary moving of the jaw
    She lying and we all can see it .


  10. She should fold and get up from the table with at least her dignity intact


  11. I thought it wer her false teeth were loose it be looking like anyone can call them self a CEO these days.
    The woman is shameless if there be a hell she be going there for sure.


  12. Relax!


  13. Is it Saturday ?
    Is it time to relax lol


  14. @ David and the Yard Ducks,

    I made a number of statements and defended thePLASMA-GASIFICATION, as opposed to the Incineration and or gasification WTE plant.Then I asked a question: What is to be done with the waste Barbadians generate when there is no more space for a landfill. aI am not looking at this year or next year but five or ten years down the road. Mt. Sinnkeroo was at least thirty or forty feet deep (Probably even deeper) when it opened. There have been all sorts of problems with it; fires odour generation, injunctions against it, court awards, etc. It has reached a height where it can go no further up; and in the meantime there is garbage rotting underneath generating methane and other things. ( A potential kick-em Jenny) Do you think?

    My question was/is:

    What is the alternative if the PLASMA-Gasification process is rejected. This is a serious question, requires Serious thought and consideration, and requires an urgent action.

    I suspect that there are other interests who would like to see the government plans derailed, so that they can introduce a waste to energy alternative (gasification) and then later, when this fails as it surely will, come back to the PLASMA_Gasification which will cost even more a few years down the line.


  15. AD
    Biodiesel from plastics and tires
    Metal recovery
    Solar
    And of course a robust recycling program
    There are lots of alternatives
    It just takes the will to do them


  16. http://www.navltd.com
    High stakes indeed
    This must be costing someone a bundle
    I really hope its worth it.


  17. It is a waste of time and energy to engage further with the so called environmental brigade who now have resorted to inane attacks on the investors involved in the WTE plant .for what it is worth whatever claims made against those who have invested in the project would have no bearing on the construction of the plant bearing in mind that EPA international rules and laws that must be completed and pass before construction begins

    In the final analysis all the pot shots claims and counter claims set up as barriers against the investors of the WTE a
    would be for naught


  18. ac
    It’s the way this thing is being pushed through.
    There was no consideration given to any HSE, environmental or emissions issues prior to the public intervention.
    This thing was being crammed down our throats with no information.
    It’s a money grab simple and true.


  19. Here is maybe some advance advise which BU David gave to a blogger who been having issues with a constructed project close to his home “bring in the Bob cat” such advice should be useful as advantage to the enviromentalist after the construction of the WTE


  20. There were meetings held in regards to the plant and only a few attended. The reluntance and objections came in lieu of the revealations presented by Cahill which bloister the fact that environmental concern by those who opposed the plant had no substantive evidence supportive of their concern in spite of the fact that WTE plants have been granted permission by the EPA
    The mad stampede of misinformation which now has originated from this issue serves to ask a question which is inclusive and as important to those who opposed “whose interest are you representing


  21. I guess you went to the wrong hall my friend.
    There is more than enough data to say this is unproven technology
    The permissions granted to other plants came about by providing all interested parties with all the data needed to grant operating permits
    This crazy lady thinks she is starting construction in September
    I would hazard a guess that the operating plants took 2 to 3 years to get sanctioned .
    How many people on this island are qualified to review and approve the mountains of calculations HAZID and HAZOPs necessary to ensure the design and the construction is correct and safe ?? We should have been gearing up to handle this contract long before it was signed by our hapless ministers.
    Once this is sold on this Canadian scammer will be gone and won’t care what carnage is left behind
    She is selling this thing on and getting as far clear of the aftermath as possible .
    Wake up
    She is in it for herself and the money not for the good of this nation or the mountain of garbage we need to deal with .


  22. Clare Cowan apprised attendees at the second open house this week it is the site specific EIA which will be started now to support TP approval.


  23. David
    The EIA specific to this plant will take at least six months to complete
    Who is the EPC /EPCM contractor????
    Has the contract for the gasifer been placed ???
    Has the balance of plant been specified and placed on order???
    This is crazyness
    Clearly this woman has no idea what it takes to design and build process plants
    I wouldn’t give her a box of Lego to play with never mind a plasma plant.


  24. Hence the reason sensible citizens have bee begging for transparency which so far has been hidden behind the excuse of the standard NDA.


  25. NDA is a smoke screen
    The signed contract is the governing document
    She is clueless
    How she got this agreement beggers belief


  26. The point is: unless the parties are persuaded to move from behind the veil of the NDA, public disclosure will remain unhelpful and continue to fuel speculation.


  27. Is there a difference between a Non Disclosure Agreement (NDA) involving a Government and a private company, and one which is made between two private companies.

    I always believed that Government spending of Taxpayers money MUST be “Transparent” unless it is a matter of Nation Security.


  28. @Hants

    You have asked a question many have wondered. Usually the bind of an NDA is breached only by a court order based on reasonable course of course.


  29. Hants

    What difference does it make whether or not the spending of taxpayers monies are transparent, if it is spent unwisely and the taxpayers have no immediate recourse, but to exercise the vote to address existing conditions the following election?


  30. The fact that it is felt that there is need for an NDA, implies ergo facto, that the parties to the agreement believe that there is something in the agreement that the public will not accept and that transparency has to be avoided at all costs.
    @David
    Should that be “reasonable COSTS of course” ?


  31. @johnjickum

    Is it not standard for private companies to operate behind an NDA to protect competitive positions.

  32. de Ingrunt Word Avatar
    de Ingrunt Word

    There are some things in life that are really just simple and straight-forward; an NDA is today’s business environment is one of those things.

    Strip away all the intrigue and matters of corruption and an NDA is used simply to protect proprietary information or business details a company seeks to withhold from competitors.

    Obviously even within the requirements of an NDA details of public contracts will still be noted in Estimate calculations or other details discussed by Parliamentarians.

    They details on pricing and other key facts on the operations of the project are impossible to seal under nebulous NDA concerns. So let’s not get carried away.

    The government officials are as complicit as CAHILL in seemingly tying up factoids under this NDA nonsense as they can certainly arrange to reveal any and all data not related to proprietary or competitive details if they so desired.


  33. @Dee Word

    Good comment!


  34. @Hants, @David there is a case here for the citizens to take the government to Court for signing the NDA since they view that it has negative implications for health and the environment. Even if it means tying up this matter in litigation until the next generation.


  35. @Heather

    Then the lawyers who live in Barbados with a future here, and children here, please stand up!


  36. Just wondering
    If this NDA is yet another figment of the crazy lady’s imagination.
    Have the government actually confirmed the existence of this NDA .
    The content of the CIM surely is a breach on Cahill’s behalf and therefore a breach in the contract proper. Great


  37. A million views on Cahill have been heard after all that has been said it is a project that must proceed. It brings substantial foreign investment and jobs to the island. Not only that its a giant step towards a green BIM. Game changers like the Cahill venture have always met stern and irrational resistance in Barbados. Mind you the naysayers disappear when the project comes on stream. Recall if you will the ABC highway. Tom Romeo Adams took the harshest of criticisms for that snaking two lane highway now its a four lane necessity. The Grantley Adams Airport, Bridgetown Port, new Kensington Oval, Sherbourne Center each one met stubborn resistance only to become essential for the productive sectors of the economy. The most crucial game changer that encountered violent widespread push back was the abolition of slavery. Think on these things as the unions stay on course to wreck the economy. Welcome Cahill donโ€™t be deterred.


  38. You can always tell a yard fowl. The EIA is still to be done and here is a jackass throwing out the welcome mat and condemning Barbadians who gave a right to be concerned. Anyone who attended the Open House meeting this week has reason to be concerned.


  39. @David,

    It is now guaranteed to cost more.

    AT 3:55 P.M. TODAY, another earthquake was recorded to the northeast of Barbados by the Seismic Research Centre (SRC) of the University of the West Indies in Trinidad and Tobago – See more at: http://www.nationnews.com/nationnews/news/70320/quake-northeast#sthash.Tc27Um0u.dpuf


  40. There a huge difference between a commercial / road project/light industrial
    Projects .
    No country in the world would sanction a plasma gasification project without proper scrutiny and review being done
    Would you …….allow your 4year kid play with a loaded gun
    That’s what we’re doing allowing this crazy lady dictate what happens on our island .


  41. I bet she doesn’t even know what the coefficient of acceleration is or means.
    I bet u she has no clue what needs to be done to meet the seismic requirements of this plant.
    Who on the island is qualified to approve the stress calcs needed on the exit refractory lined duct at the top of the gasifer
    I suggest you look at Japan or India and the rigor they put into the design of plasma gasification plants a quarter the size if this un proven yet to be designed beast


  42. By Clare’s admission Cahill is the developer, her company of which she is the 10% shareholder, hires the consultants and experts.


  43. Fox watching hen house!!!!!!!!!
    That’s not the way it works
    Someone designated by the government should be reviewing every calculation , specification ,purchase order drawings code reviews,hazop hazid, design basis
    Process description, and the hundreds of other documents required to design and build this thing


  44. Can you state a review process as you have described is not in place.


  45. @David,

    The focus should not be on Cowan.

    The focus should be on the Government Ministers and what justified approval of this project.


  46. I bet my Cadillac none of this review process is in place !!!!!!
    It’s taken her 16 months to complete a 6 to 8 week waste characteristic study .
    The government are clueless
    The 4 Amigo’s signed the contract and have done nothing else since .

    It’s a travesty


  47. There are competent qualified professionals in every ministry in Government.

    They are quite capable of examining a proposal for a WTE plant and advising the Minister.

    They question is whether they are allowed to do their jobs.


  48. I’m sure there are well qualified engineers in the government
    Problem is we are well past the proposal stage
    Cahill have a contract to build the thing
    There was no proposal phase
    This thing was single sourced for God only knows why
    I’m not being derogatory but no one in government has been exposed to a beast such as this
    But then again neither has Cahill


  49. Looking through the multitude of posts on this Cahill energy scandal I was wondering how come the government haven’t looked for a balance sheet from this company ??
    Looks like its a do it yourself company with no real people or value
    One comment said they were worried Cahill would move to another Caribbean island and put a Wte plant there instead of here
    I don’t think Cahill could build a basic Lego toy.they don’t have the capabilities either in technical know how or people power.
    The government really need to step in soon to avoid any further embarrassing information coming out about the architects of this ill fated exercise in incompetentance and dishonesty
    The open house looked like it was a school debating practice run with a lot of non committal answers
    I also read that there were investors visiting the island 2 months ago or so
    Did they ever arrive ???
    Truthfully I wouldn’t wouldn’t believe this woman’s radio !!!!!!!!
    David as blog master is there any way you can consolidate the different posts into one for ease of review.???
    There is so much great information on the fascinating rise to infamy of this crazy person it should be made into a made for TV movie.
    What the title should be and who whou take the lead roles I will leave to other readers.


  50. Cahill Energy is NOT an engineering company. Reading on the particulars of the company and Ms. Cahil, and Cahill Engineering. Cahil Energy is a facilitating company; whose purpose seems to the to gather the per cons or companies who would be interested in funding the project. Cahill engineering is (would be) the engineering company BUILDING the plant. People seem to be mixing up the two companies. Companies seeking to interest venture capitalists exist all over the world and they are reputable companies. Why should people refer to the person as “this crazy person”; what makes her “crazy”?

The blogmaster invites you to join and add value to the discussion.

Trending

Discover more from Barbados Underground

Subscribe now to keep reading and get access to the full archive.

Continue reading